Parameter Detail: ICE-01(run 10)
start date (GMT) |
2008-12-25 (360) |
end date (GMT) |
2008-12-26 (361) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.3 |
nucleation cell temperature (post nucleation) [degC] |
3.79 -> 3.75 |
control time (stabilization start) |
22:50:00 |
control time (nucleation start) |
00:22:53 |
control time (laten heat release) |
00:24:24 |
control time (crystalize start) |
00:53:40 |
control time (melt start) |
01:19:26 |
control time (melt end) |
01:22:40 |
control duration (stabilization) |
01:32:53 |
control duration (nucleation) |
00:01:31 |
control duration (crystalization) |
00:30:47 |
control duration (observation) |
00:25:46 |
control duration (total) |
00:59:47 |
note |
|