Parameter Detail: ICE-01(run 11)
start date (GMT) |
2009-01-05 (5) |
end date (GMT) |
2009-01-06 (6) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6 |
nucleation cell temperature (post nucleation) [degC] |
3.79 -> 3.76 |
control time (stabilization start) |
21:51:30 |
control time (nucleation start) |
22:56:36 |
control time (laten heat release) |
22:57:56 |
control time (crystalize start) |
23:31:05 |
control time (melt start) |
01:10:00 |
control time (melt end) |
01:10:30 |
control duration (stabilization) |
01:05:06 |
control duration (nucleation) |
00:01:20 |
control duration (crystalization) |
00:34:29 |
control duration (observation) |
01:38:55 |
control duration (total) |
02:13:54 |
note |
|