Parameter Detail: ICE-01(run 12)
start date (GMT) |
2009-01-06 (6) |
end date (GMT) |
2009-01-06 (6) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-12 |
nucleation cell temperature (post nucleation) [degC] |
3.79 -> 3.77 -> 3.79 |
control time (stabilization start) |
01:17:57 |
control time (nucleation start) |
02:26:16 |
control time (laten heat release) |
02:38:22 |
control time (crystalize start) |
02:54:00 |
control time (melt start) |
04:00:30 |
control time (melt end) |
04:02:00 |
control duration (stabilization) |
01:08:19 |
control duration (nucleation) |
00:12:06 |
control duration (crystalization) |
00:27:44 |
control duration (observation) |
01:06:30 |
control duration (total) |
01:35:44 |
note |
|