Parameter Detail: ICE-01(run 17)
start date (GMT) |
2009-01-20 (20) |
end date (GMT) |
2009-01-20 (20) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8 |
nucleation cell temperature (post nucleation) [degC] |
3.79 |
control time (stabilization start) |
03:25:10 |
control time (nucleation start) |
04:30:18 |
control time (laten heat release) |
04:32:08 |
control time (crystalize start) |
05:02:57 |
control time (melt start) |
07:06:50 |
control time (melt end) |
07:08:40 |
control duration (stabilization) |
01:05:08 |
control duration (nucleation) |
00:01:50 |
control duration (crystalization) |
00:32:39 |
control duration (observation) |
02:03:53 |
control duration (total) |
02:38:22 |
note |
|