Parameter Detail: ICE-01(run 2)
start date (GMT) |
2008-12-17 (352) |
end date (GMT) |
2008-12-17 (352) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5.9 |
nucleation cell temperature (post nucleation) [degC] |
3.79 |
control time (stabilization start) |
19:28:00 |
control time (nucleation start) |
20:55:08 |
control time (laten heat release) |
20:56:10 |
control time (crystalize start) |
22:05:15 |
control time (melt start) |
23:50:00 |
control time (melt end) |
23:52:20 |
control duration (stabilization) |
01:27:08 |
control duration (nucleation) |
00:01:02 |
control duration (crystalization) |
01:10:07 |
control duration (observation) |
01:44:45 |
control duration (total) |
02:57:12 |
note |
|