Parameter Detail: ICE-01(run 23)
start date (GMT) |
2009-02-11 (42) |
end date (GMT) |
2009-02-11 (42) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-4 |
nucleation cell temperature (post nucleation) [degC] |
3.79 |
control time (stabilization start) |
03:49:28 |
control time (nucleation start) |
05:01:53 |
control time (laten heat release) |
05:02:55 |
control time (crystalize start) |
05:17:52 |
control time (melt start) |
06:32:19 |
control time (melt end) |
06:52:00 |
control duration (stabilization) |
01:12:25 |
control duration (nucleation) |
00:01:02 |
control duration (crystalization) |
00:15:59 |
control duration (observation) |
01:14:27 |
control duration (total) |
01:50:07 |
note |
|