Parameter Detail: ICE-01(run 23)

start date (GMT) 2009-02-11 (42)
end date (GMT) 2009-02-11 (42)
degree of supercooling 0.03
crystalization cell temperature [degC] 3.79
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -4
nucleation cell temperature (post nucleation) [degC] 3.79
control time (stabilization start) 03:49:28
control time (nucleation start) 05:01:53
control time (laten heat release) 05:02:55
control time (crystalize start) 05:17:52
control time (melt start) 06:32:19
control time (melt end) 06:52:00
control duration (stabilization) 01:12:25
control duration (nucleation) 00:01:02
control duration (crystalization) 00:15:59
control duration (observation) 01:14:27
control duration (total) 01:50:07
note