Parameter Detail: ICE-02(run 1)
start date (GMT) |
2008-12-11 (346) |
end date (GMT) |
2008-12-11 (346) |
degree of supercooling |
0.05 |
crystalization cell temperature [degC] |
3.77 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-10 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
19:59:15 |
control time (nucleation start) |
22:45:08 |
control time (laten heat release) |
|
control time (crystalize start) |
23:07:00 |
control time (melt start) |
23:37:04 |
control time (melt end) |
23:39:48 |
control duration (stabilization) |
02:45:53 |
control duration (nucleation) |
|
control duration (crystalization) |
00:21:52 |
control duration (observation) |
00:30:04 |
control duration (total) |
00:54:40 |
note |
|