Parameter Detail: ICE-02(run 4)
start date (GMT) |
2009-01-12 (12) |
end date (GMT) |
2009-01-12 (12) |
degree of supercooling |
0.05 |
crystalization cell temperature [degC] |
3.77 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-11.5 |
nucleation cell temperature (post nucleation) [degC] |
3.77 |
control time (stabilization start) |
19:53:00 |
control time (nucleation start) |
21:09:33 |
control time (laten heat release) |
21:14:26 |
control time (crystalize start) |
21:23:40 |
control time (melt start) |
22:06:35 |
control time (melt end) |
22:08:00 |
control duration (stabilization) |
01:16:33 |
control duration (nucleation) |
00:04:53 |
control duration (crystalization) |
00:14:07 |
control duration (observation) |
00:42:55 |
control duration (total) |
00:58:27 |
note |
|