Parameter Detail: ICE-04(run 7)
start date (GMT) |
2009-02-09 (40) |
end date (GMT) |
2009-02-09 (40) |
degree of supercooling |
0.07 |
crystalization cell temperature [degC] |
3.75 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8.7 |
nucleation cell temperature (post nucleation) [degC] |
3.75 |
control time (stabilization start) |
04:26:45 |
control time (nucleation start) |
05:35:58 |
control time (laten heat release) |
05:37:49 |
control time (crystalize start) |
05:46:14 |
control time (melt start) |
06:11:57 |
control time (melt end) |
06:15:00 |
control duration (stabilization) |
01:09:13 |
control duration (nucleation) |
00:01:51 |
control duration (crystalization) |
00:10:16 |
control duration (observation) |
00:25:43 |
control duration (total) |
00:39:02 |
note |
|