Parameter Detail: ICE-05(run 3)
start date (GMT) |
2009-01-12 (12) |
end date (GMT) |
2009-01-12 (12) |
degree of supercooling |
0.08 |
crystalization cell temperature [degC] |
3.74 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8.1 |
nucleation cell temperature (post nucleation) [degC] |
3.74 |
control time (stabilization start) |
01:41:25 |
control time (nucleation start) |
03:19:11 |
control time (laten heat release) |
03:20:55 |
control time (crystalize start) |
03:32:31 |
control time (melt start) |
03:59:07 |
control time (melt end) |
04:01:48 |
control duration (stabilization) |
01:37:46 |
control duration (nucleation) |
00:01:44 |
control duration (crystalization) |
00:13:20 |
control duration (observation) |
00:26:36 |
control duration (total) |
00:42:37 |
note |
|