Parameter Detail: ICE-01(run 5)
start date (GMT) |
2008-12-23 (358) |
end date (GMT) |
2008-12-24 (359) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7.45 |
nucleation cell temperature (post nucleation) [degC] |
3.79 |
control time (stabilization start) |
23:46:52 |
control time (nucleation start) |
04:16:26 |
control time (laten heat release) |
04:17:56 |
control time (crystalize start) |
04:39:39 |
control time (melt start) |
05:19:22 |
control time (melt end) |
05:22:04 |
control duration (stabilization) |
04:29:34 |
control duration (nucleation) |
00:01:30 |
control duration (crystalization) |
00:23:13 |
control duration (observation) |
00:39:43 |
control duration (total) |
01:05:38 |
note |
|