Parameter Detail: ICE-01(run 5)

start date (GMT) 2008-12-23 (358)
end date (GMT) 2008-12-24 (359)
degree of supercooling 0.03
crystalization cell temperature [degC] 3.79
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7.45
nucleation cell temperature (post nucleation) [degC] 3.79
control time (stabilization start) 23:46:52
control time (nucleation start) 04:16:26
control time (laten heat release) 04:17:56
control time (crystalize start) 04:39:39
control time (melt start) 05:19:22
control time (melt end) 05:22:04
control duration (stabilization) 04:29:34
control duration (nucleation) 00:01:30
control duration (crystalization) 00:23:13
control duration (observation) 00:39:43
control duration (total) 01:05:38
note