Parameter Detail: ICE-01(run 8)
start date (GMT) |
2008-12-25 (360) |
end date (GMT) |
2008-12-25 (360) |
degree of supercooling |
0.03 |
crystalization cell temperature [degC] |
3.79 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.8 |
nucleation cell temperature (post nucleation) [degC] |
3.79 -> 3.67 |
control time (stabilization start) |
03:55:00 |
control time (nucleation start) |
05:10:55 |
control time (laten heat release) |
05:12:00 |
control time (crystalize start) |
05:36:00 |
control time (melt start) |
05:53:29 |
control time (melt end) |
05:56:17 |
control duration (stabilization) |
01:15:55 |
control duration (nucleation) |
00:01:05 |
control duration (crystalization) |
00:25:05 |
control duration (observation) |
00:17:29 |
control duration (total) |
00:45:22 |
note |
|