Parameter Detail: DS1-10

start date (GMT) 2013-10-22 (295)
end date (GMT) 2013-10-23 (296)
team
disk diameter [mm] 30
target liquid bridge length [mm] 15
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] 2.0
recording status with VRU Rec.
operation target measuremnet of DSD, flow transition
note No data from GMT22:37 to 22:50