Parameter Detail: DS2-15

start date (GMT) 2015-03-04 (63)
end date (GMT) 2015-03-05 (64)
team
disk diameter [mm] 10
target liquid bridge length [mm] 10
initial gap [mm] 5.00
cooling disk position at the end of experiment [mm] -2.5
aspect ratio (L/D) 1
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm]
recording status with VRU Rec. No Down link video.
operation target influence of cooling disk temp. on critical DT
note