Parameter Detail: DS2-02

start date (GMT) 2014-12-16 (350)
end date (GMT) 2014-12-17 (351)
team
disk diameter [mm] 10
target liquid bridge length [mm] 5
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] from 0 to 4.92
recording status without VRU Rec.
operation target critical DT, measurement of DSD
note fixed IR image field at Dec. 15; 22:01-23:32 air bubble removal;