Parameter Detail: DS2-03

start date (GMT) 2014-12-17 (351)
end date (GMT) 2014-12-18 (352)
team
disk diameter [mm] 10
target liquid bridge length [mm] 10
initial gap [mm] 3.00
cooling disk position at the end of experiment [mm] 2
aspect ratio (L/D) 1
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] from 0 to 9.9
recording status without VRU Rec.
operation target critical DT, measurement of DSD
note 22:25-00:13 air bubble removal