Parameter Detail: DS2-04

start date (GMT) 2014-12-24 (358)
end date (GMT) 2014-12-25 (359)
team
disk diameter [mm] 10
target liquid bridge length [mm] 2.5, 5
initial gap [mm] 5.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 0.25, 0.5
typical volume ratio (V/V0) 1
MIDM image position from HD surface (Edge) [mm] 0.1
recording status with VRU Rec. No Down link video.
operation target critical DT
note