Parameter Detail: MEIS1-CO

start date (GMT) 2008-08-19 (232)
end date (GMT) 2008-08-20 (233)
team ALL
disk diameter [mm] 30
target liquid bridge length [mm]
initial gap [mm] 0.36
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D)
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1)
operation target checking FPEF facilities
note check out day for experiment system