Parameter Detail: MEIS3-01

start date (GMT) 2011-09-19 (262)
end date (GMT) 2011-09-20 (263)
team JAXA/nishino
disk diameter [mm] 30
target liquid bridge length [mm] 18.9
initial gap [mm] 0.301
cooling disk position at the end of experiment [mm] 0.729
aspect ratio (L/D) 0.63
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1)
operation target
note check out day for features of this Experiment Cell and PAS researching