Parameter Detail: MIES4-CO1

start date (GMT) 2010-08-27 (239)
end date (GMT) 2010-08-28 (240)
team JAXA
disk diameter [mm] 50
target liquid bridge length [mm]
initial gap [mm] 0.20
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D)
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1)
operation target
note check out day-1 for 3D camera focus.