Parameter Detail: MIES4-CO2

start date (GMT) 2010-09-20 (263)
end date (GMT) 2010-09-21 (264)
team JAXA
disk diameter [mm] 50
target liquid bridge length [mm]
initial gap [mm] 0.20
cooling disk position at the end of experiment [mm] 0.30
aspect ratio (L/D)
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1) (230,125)
operation target
note check out day-2 for experiment system. The initial gap was set to 0.5mm.