Parameter Detail: MEIS5-30

start date (GMT) 2013-02-21 (52)
end date (GMT) 2013-02-22 (53)
team nishino
disk diameter [mm] 50
target liquid bridge length [mm] 50
initial gap [mm] 1.00
cooling disk position at the end of experiment [mm] 0
aspect ratio (L/D) 1.00
typical volume ratio (V/V0) 0.95
measuring point in IR image coordinate (X1, Y1) (132,124)
operation target pre-research for temperature measurement inside Liquid Bridge
note ISS attitude control. No VRU Recording