Parameter Detail: ICE-16(run 5)
start date (GMT) |
2009-01-28 (28) |
end date (GMT) |
2009-01-28 (28) |
degree of supercooling |
1.00 |
crystalization cell temperature [degC] |
2.82 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8.3 |
nucleation cell temperature (post nucleation) [degC] |
0 -> 2.82 |
control time (stabilization start) |
02:28:59 |
control time (nucleation start) |
03:24:20 |
control time (laten heat release) |
03:26:00 |
control time (crystalize start) |
|
control time (melt start) |
|
control time (melt end) |
|
control duration (stabilization) |
00:55:21 |
control duration (nucleation) |
00:01:40 |
control duration (crystalization) |
|
control duration (observation) |
|
control duration (total) |
|
note |
|