Parameter Detail: DS1-10
start date (GMT) | 2013-10-22 (295) |
---|---|
end date (GMT) | 2013-10-23 (296) |
team | |
disk diameter [mm] | 30 |
target liquid bridge length [mm] | 15 |
initial gap [mm] | 3.00 |
cooling disk position at the end of experiment [mm] | 0 |
aspect ratio (L/D) | 0.5 |
typical volume ratio (V/V0) | 1 |
MIDM image position from HD surface (Edge) [mm] | 2.0 |
recording status | with VRU Rec. |
operation target | measuremnet of DSD, flow transition |
note | No data from GMT22:37 to 22:50 |