Parameter Detail: ICE-13(run 6)
start date (GMT) |
2009-02-09 (40) |
end date (GMT) |
2009-02-10 (41) |
degree of supercooling |
0.70 |
crystalization cell temperature [degC] |
3.12 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
22:56:54 |
control time (nucleation start) |
00:05:02 |
control time (laten heat release) |
00:06:45 |
control time (crystalize start) |
00:14:35 |
control time (melt start) |
00:17:50 |
control time (melt end) |
00:21:02 |
control duration (stabilization) |
01:08:08 |
control duration (nucleation) |
00:01:43 |
control duration (crystalization) |
00:09:33 |
control duration (observation) |
00:03:15 |
control duration (total) |
00:16:00 |
note |
|