Parameter Detail: ICE-14(run 4)
start date (GMT) |
2009-01-27 (27) |
end date (GMT) |
2009-01-27 (27) |
degree of supercooling |
0.80 |
crystalization cell temperature [degC] |
3.02 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-8 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
03:25:00 |
control time (nucleation start) |
04:39:40 |
control time (laten heat release) |
04:41:28 |
control time (crystalize start) |
04:49:20 |
control time (melt start) |
04:50:45 |
control time (melt end) |
04:54:00 |
control duration (stabilization) |
01:14:40 |
control duration (nucleation) |
00:01:48 |
control duration (crystalization) |
00:09:40 |
control duration (observation) |
00:01:25 |
control duration (total) |
00:14:20 |
note |
|