Parameter Detail: ICE-03(run 3)
start date (GMT) |
2009-01-13 (13) |
end date (GMT) |
2009-01-13 (13) |
degree of supercooling |
0.06 |
crystalization cell temperature [degC] |
3.76 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-10 |
nucleation cell temperature (post nucleation) [degC] |
3.76 |
control time (stabilization start) |
20:04:39 |
control time (nucleation start) |
21:42:10 |
control time (laten heat release) |
21:45:55 |
control time (crystalize start) |
21:57:20 |
control time (melt start) |
22:35:07 |
control time (melt end) |
22:37:40 |
control duration (stabilization) |
01:37:31 |
control duration (nucleation) |
00:03:45 |
control duration (crystalization) |
00:15:10 |
control duration (observation) |
00:37:47 |
control duration (total) |
00:55:30 |
note |
|