Parameter Detail: ICE-06(run 2)
start date (GMT) |
2009-01-12 (12) |
end date (GMT) |
2009-01-13 (13) |
degree of supercooling |
0.09 |
crystalization cell temperature [degC] |
3.73 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-6.4 |
nucleation cell temperature (post nucleation) [degC] |
3.73 |
control time (stabilization start) |
22:21:01 |
control time (nucleation start) |
00:36:15 |
control time (laten heat release) |
00:37:36 |
control time (crystalize start) |
00:48:20 |
control time (melt start) |
01:06:10 |
control time (melt end) |
01:09:00 |
control duration (stabilization) |
02:15:14 |
control duration (nucleation) |
00:01:21 |
control duration (crystalization) |
00:12:05 |
control duration (observation) |
00:17:50 |
control duration (total) |
00:32:45 |
note |
|