Parameter Detail: ICE-08(run 4)
start date (GMT) |
2009-01-19 (19) |
end date (GMT) |
2009-01-19 (19) |
degree of supercooling |
0.20 |
crystalization cell temperature [degC] |
3.62 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-4.5 |
nucleation cell temperature (post nucleation) [degC] |
3.62 |
control time (stabilization start) |
20:00:27 |
control time (nucleation start) |
21:21:24 |
control time (laten heat release) |
21:22:20 |
control time (crystalize start) |
21:27:00 |
control time (melt start) |
21:33:40 |
control time (melt end) |
21:36:20 |
control duration (stabilization) |
01:20:57 |
control duration (nucleation) |
00:00:56 |
control duration (crystalization) |
00:05:36 |
control duration (observation) |
00:06:40 |
control duration (total) |
00:14:56 |
note |
|