Parameter Detail: ICE-09(run 8)
start date (GMT) |
2009-02-11 (42) |
end date (GMT) |
2009-02-11 (42) |
degree of supercooling |
0.30 |
crystalization cell temperature [degC] |
3.52 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-5 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
02:21:35 |
control time (nucleation start) |
03:23:34 |
control time (laten heat release) |
03:24:42 |
control time (crystalize start) |
03:36:00 |
control time (melt start) |
03:41:20 |
control time (melt end) |
03:45:00 |
control duration (stabilization) |
01:01:59 |
control duration (nucleation) |
00:01:08 |
control duration (crystalization) |
00:12:26 |
control duration (observation) |
00:05:20 |
control duration (total) |
00:21:26 |
note |
|