Parameter Detail: ICE-13(run 3)

start date (GMT) 2009-01-23 (23)
end date (GMT) 2009-01-23 (23)
degree of supercooling 0.70
crystalization cell temperature [degC] 3.12
nucleation cell temperature (pre nucleation) [degC] 10
nucleation cell temperature (nucleation start) [degC] -10
nucleation cell temperature (laten heat release) [degC] -7
nucleation cell temperature (post nucleation) [degC] 0
control time (stabilization start) 04:50:00
control time (nucleation start) 05:55:08
control time (laten heat release) 05:56:25
control time (crystalize start) 06:05:00
control time (melt start) 06:06:44
control time (melt end) 06:10:00
control duration (stabilization) 01:05:08
control duration (nucleation) 00:01:17
control duration (crystalization) 00:09:52
control duration (observation) 00:01:44
control duration (total) 00:14:52
note