Parameter Detail: ICE-13(run 3)
start date (GMT) |
2009-01-23 (23) |
end date (GMT) |
2009-01-23 (23) |
degree of supercooling |
0.70 |
crystalization cell temperature [degC] |
3.12 |
nucleation cell temperature (pre nucleation) [degC] |
10 |
nucleation cell temperature (nucleation start) [degC] |
-10 |
nucleation cell temperature (laten heat release) [degC] |
-7 |
nucleation cell temperature (post nucleation) [degC] |
0 |
control time (stabilization start) |
04:50:00 |
control time (nucleation start) |
05:55:08 |
control time (laten heat release) |
05:56:25 |
control time (crystalize start) |
06:05:00 |
control time (melt start) |
06:06:44 |
control time (melt end) |
06:10:00 |
control duration (stabilization) |
01:05:08 |
control duration (nucleation) |
00:01:17 |
control duration (crystalization) |
00:09:52 |
control duration (observation) |
00:01:44 |
control duration (total) |
00:14:52 |
note |
|