Parameter Detail: MEIS1-02

start date (GMT) 2008-08-23 (236)
end date (GMT) 2008-08-24 (237)
team ALL
disk diameter [mm] 30
target liquid bridge length [mm] 15 (max.)
initial gap [mm] 0.36
cooling disk position at the end of experiment [mm] 0.1
aspect ratio (L/D)
typical volume ratio (V/V0)
measuring point in IR image coordinate (X1, Y1) (228,119)
operation target bubble removal
note study of air bubble removal